CommissioningWe use a systematic process to assess, test, improve, and integrate the operations and energy performance of the building systems. This process results in a sustainable, efficient and properly functioning facility throughout the building’s lifecycle.

Services

  • development of Owner’s Project Requirements (OPR)
  • review of engineer’s Basis of Design
  • commissioning plan and report writing
  • project-specific commissioning specification development
  • design reviews
  • component verification checklist development
  • equipment installation verification/witnessing
  • test and balance report review and verification

    Dry Dock #1, Pearl Harbor Hawaii  with the USS Greeneville in residence. 15000 Inc. performed the commissioning for the retrofit of the massive pumps that have been serving this dry dock for over 100 years.

    Dry Dock #1, Pearl Harbor Hawaii with the USS Greeneville in residence. 15000 Inc. performed the commissioning for the retrofit of the massive pumps that have been serving this dry dock for over 100 years.

  • functional performance testing
  • systems manual development
  • operator training verification
  • warranty walk-through and issue resolution oversight
  • measurement and verification

Projects

  • Dry Dock #1, Pearl Harbor Hawaii
  • Los Angeles Air Force Base
  • Eureka Veterans Administration Clinic
  • Comcast, Rohnert Park
  • Ross Elementary School